Signs your panel needs an upgrade
- You still have a fuse box, or a 60A or 100A service in a larger home
- Breakers trip often, or the lights dim when a big appliance starts
- There are no free spaces left in the panel for new circuits
- You're planning an EV charger, heat pump, central air, hot tub, basement unit or a major renovation
- Your insurance company or a home inspector flagged the panel
If the panel is hot, buzzing, rusty or has scorch marks, don't wait. Call us, and if you smell burning, call 911.
100A to 200A service upgrades
Many older houses in the GTA were built with 60A or 100A service. That was enough when they were built. It often isn't once you add an EV charger, a heat pump, air conditioning or a second kitchen.
A 200A upgrade usually means a new panel and, depending on the house, a new meter base and service cable. The local utility has to disconnect and reconnect the power (Toronto Hydro in Toronto; Alectra Utilities in Vaughan, Markham, Richmond Hill, Mississauga and Brampton), so the job is booked with them in advance and the power is off while the panel is changed.
Panel replacement
Sometimes the service size is fine but the panel itself is the problem: an old fuse panel, a panel with no room left, or one that is worn out. Replacing it gives you modern breakers, including the arc-fault and ground-fault protection the Ontario Electrical Safety Code now requires in many places, and space for future circuits.
Sub-panels
A sub-panel adds circuits closer to where they are needed without replacing the main panel, as long as the main service has capacity. Common uses: finished basements and basement units, additions, detached garages and workshops, and commercial units that need more circuits.
Start with a load calculation
The right answer depends on what your service can actually carry. A load calculation adds up what is already connected and what you plan to add. Sometimes it shows a full upgrade is needed; sometimes a sub-panel, or a load-management device for an EV charger, is enough. See EV charger installation for that case.
A panel or service upgrade needs an ESA notification and inspection, and in Ontario only a Licensed Electrical Contractor can file it. RD Electric Services Inc. is licensed: ECRA/ESA #7018810 (verify on ESA).